06 September — 09 September
|
Delays likely – Road closure
|
Works location: A4 to rugby club
|
Works description: Surface Dressing Works
|
Responsibility for works: Wokingham Borough Council
|
|
04 September — 06 September
|
Delays likely – Traffic control (multi-way signals)
|
Works location: 76
|
Works description: Main Clamp 0 to 6″ CWAY
|
Responsibility for works: Thames Water
|
|
07 September — 07 September
|
Delays likely – Road closure
|
Works location: Length of Mays Lane
|
Works description: Surface dressing works
|
Responsibility for works: Wokingham Borough Council
|
|
07 September — 07 September
|
Delays likely – Road closure
|
Works location: Crockhamwell Road to Fairwater Drive
|
Works description: Surface dressing works
|
Responsibility for works: Wokingham Borough Council
|
|
04 September — 06 September
|
Delays possible – Some carriageway incursion
|
Works location: Outside 67
|
Works description: Service Pipe Repair >33mm Fway in Footway.
|
Responsibility for works: Thames Water
|
|
04 September — 06 September
|
Delays possible – Some carriageway incursion
|
Works location: 46
|
Works description: Boundary Box Exchange Unmade in Verge.
|
Responsibility for works: Thames Water
|
|
06 September — 19 September
|
Delays possible – Some carriageway incursion
|
Works location: Opposite Hawkehurst House
|
Works description: Excavate a 3 x 1m joint hole in footway to disconnect substation on site. Backfill & reinstate.
|
Responsibility for works: Scottish and Southern Power Distribution
|
|
08 September — 11 September
|
Delays possible – Some carriageway incursion
|
Works location: 44
|
Works description: Boundary Box Exchange Fway in Footway.
|
Responsibility for works: Thames Water
|
|
03 September — 05 September
|
Delays unlikely – Some carriageway incursion
|
Works location: 82
|
Works description: Service Pipe Repair <33mm Fway in Footway.
|
Responsibility for works: Thames Water
|
|
04 September — 06 September
|
Delays unlikely – Some carriageway incursion
|
Works location: Side of 36, Chiltern Crescent
|
Works description: Washout Exchange 0 to 6″ Fway in Footway.
|
Responsibility for works: Thames Water
|
|
04 September — 06 September
|
Delays unlikely – Some carriageway incursion
|
Works location: 5
|
Works description: Serv Pipe Relay Inc Fitting Sz P Fway in Footway.
|
Responsibility for works: Thames Water
|
|
06 September — 06 September
|
Delays unlikely – Traffic control (give & take)
|
Works location: Outside 4
|
Works description: Carriageway patching
|
Responsibility for works: Wokingham Borough Council
|
|
03 September — 05 September
|
Delays unlikely – Some carriageway incursion
|
Works location: 40
|
Works description: B Box Exchange <33mm Cway in Carriageway.
|
Responsibility for works: Thames Water
|
|
11 September — 19 September
|
Delays unlikely – Some carriageway incursion
|
Works location: Outside 15
|
Works description: Excavate joint hole in verge
|
Responsibility for works: Scottish and Southern Power Distribution
|
|
06 September — 06 September
|
Delays unlikely – Traffic control (give & take)
|
Works location: Outside 1
|
Works description: Carriageway patching
|
Responsibility for works: Wokingham Borough Council
|
|
09 September — 11 September
|
Delays unlikely – Traffic control (give & take)
|
Works location: Outside 21
|
Works description: Dropped crossing installation
|
Responsibility for works: Wokingham Borough Council
|
|
05 September — 09 September
|
Delays unlikely – Some carriageway incursion
|
Works location: 40
|
Works description: B Box Exchange <33mm Fway in Footway.
|
Responsibility for works: Thames Water
|
|
06 September — 06 September
|
Delays unlikely – Traffic control (give & take)
|
Works location: Outside 11
|
Works description: Carriageway patching
|
Responsibility for works: Wokingham Borough Council
|
|
04 September — 06 September
|
Delays unlikely – Some carriageway incursion
|
Works location: 2
|
Works description: Service Pipe Repair <33mm Fway in Footway.
|
Responsibility for works: Thames Water
|
|
Update from Wokingham Borough Council
Kingfisher Drive will be subject to rolling road closures for portions of the road. The hours of the closure are scheduled between 9.30 – 16:00 between the dates of 16.09.2019 and 20.09.2019.
Rickman Close will be subject to closure on 18.09.2019.
Wallace Close will be subject to closure between 20.09.2019 and 21.09.2019.
Larch Drive will be subject to closure between 21.09.2019 and 22.09.2019.
Fairwater Drive will be subject to closure between 22.09.2019 and 23.09.2019.
The Borough Council will be improving the asphalt of these areas. For further information, and to check works to roads outside of Woodley please contact Wokingham Borough Council.